There are no quiet days at our construction site. They hung sheetrock on a Saturday, finished siding the house on a Sunday and work proceeds steadily Monday through Friday. With our red door key (to match the red doorknob) we check the progress every few days. We are not looking for errors so much as we are curious as to the flow of all these sub-contractors who slip in and out of the timeline.
During one early evening visit, we discovered the electrician missed running the conduit for the in-floor outlet in the TV room. Unfortunately, we did not catch this omission until after the slab had been poured. But, as it was clearly noted on the approved plans, a worker with a concrete saw cut a trough and the electrician ran the wire exactly to my request. I had laid out the perfect viewing dimensions of the new TV room using a triangular ruler, graph paper, and snips of to-scale cover stock representing the furniture. Just as requested, we now have a double outlet 6’-5” from the west wall and 9’-6” from the south/garage wall for over-the-shoulder task lighting. The patched floor is ugly but all will be hidden when the LVP is installed.
With steady progress at the site, we fill our days with behind-the-scenes tasks. Two Men & A Truck walked through our 1st Street house and provided estimates for packing and moving. We selected window dressings at Hirschfields. And we continue the onerous task of evaluating 40 years of detritus tucked in closets. The timing of recent family visits allowed us to repurpose four bags of books and a unique selection of Cubs swag. As the days and weeks progress, our to-do list will continue to grow.